
fam_Espresso machine · E61 dual boiler
Tower Adele
Manuals, maintenance, water filters, troubleshooting and spare parts for your machine, all in one place.
- Heating system
- Dual boiler
- Group
- E61
- Pump
- Rotary pump
- Brew boiler
- 0.75 l
- Steam boiler
- 1.5 l
- Water tank
- 2.4 l
- Water
- Tank or plumbed-in
- Portafilter
- 58 mm
- Temperature
- PID
Maintenance
How to look after your Adele
An E61 dual boiler machine is backflushed daily with water and weekly with cleaning detergent, and the group gasket is replaced about once a year. The brew boiler holds the right temperature via PID, so there is no need for a cooling flush. Here is the schedule and the products we recommend.
Good to know about the Tower Adele
Select Options > Settings > Water inlet and set it to RETE (mains). Connect the hose to the mains water supply; the pump pressure is then adjusted as described in the manual.
Torre specifies a water hardness of 7–14 °dH and recommends a water filter or water softener if needed, as limescale can seriously damage the machine.
Put the blind basket in the portafilter, lock it in and run for 4–5 seconds. Repeat a few times if needed.
-
Every day
- Purge and wipe the steam wand after every use
- Backflush with water and a blind basket
- Rinse the portafilter and basket, empty the drip tray
-
Every week
- Backflush with Cafetto EVO
- Soak the portafilters and baskets
- Steam tip in milk system cleaner
- Brush the group gasket
-
Every month
- Wash the water tank
- Change the water in the brew boiler and steam boiler as described in the manual
- Soak the shower screen and dispersion plate
-
Every 6–12 months
- Replace the group gasket and shower screen
- Lubricate the cam
- Replace the tank filter (every 2–3 months)
- Replace the cartridge if plumbed in (according to capacity)
Essential maintenance kit
Cleaning detergent, milk system cleaner, blind basket and brush. Everything you need for daily and weekly cleaning.
Cleaning products
Tools
Wear parts for Tower Adele
Original parts that fit your model. Replace the group gasket and shower screen every 6–12 months. How to replace them
Upgrades
A bottomless portafilter shows you instantly if your coffee is channelling. A spring-loaded tamper, a distribution tool and a precision basket give you more even extraction, shot after shot.
Accessories for your Adele
Original accessories and wooden trim made specifically for your machine.
Water and filters
The right water protects your machine
The target is 2–4 °dH. Do not use distilled water; the machine needs minerals for the level sensor to work.
Can be plumbed in
Your Adele has a rotary pump and can be connected directly to the mains water supply. We recommend BWT Bestmax with an installation kit.
Troubleshooting and guides
What do you need help with?
Noise
Back to categories ↑No guide matches. Ask us and we will help you.
Manuals and spare parts


